Plans to install the new rising main sewer from the new Lorenzen Bay Waste Water Pump Station to Cambrae Road with big diggers were changed when the difficulty of the job became evident. Instead a giant Vermeer Series II Directional Drilling rig was brought in to do the job. With 2,983 Nm of rotational torque, the rig was able to drill underneath the beach access staircase, then through private property in Lorenzen Bay Road to join up with the new pump station.